MARCEGAGLIA
construction equipment division
Construction equipment
and systems
From the introduction of the tube/coupler
structural system on, construction equipment
division gave a remarkable contribution to
the evolution and development of construction techniques.
A continuous innovation process and an incessant care about the emerging needs
of the building business drove the company to broaden its product range, which
today includes prefabricated frames, multi-level systems, temporary
roofs and formworks, propping and fencing systems.
Scaffolding
Tube-coupler system
Multidirectional system SM8
Realpont system
Tel Dal T5/Uniform
Tel Dal H system
Deck planks
Frame containers
Temporary structures
Single ramp ladder tower SM8
Free-standing double ramp ladder tower SM8
Modular SMP8 tower ladder
Temporary roofs
Propping
SMP8 system
Telescopic props
Slab Deck floor casting system
Pal Dal system
TPC system
Preform
formworks
Preform system
Light Preform system
External climbing formwork system
Internal climbing formwork system
Ground casting system
Enclosures
Electromechanical lifting equipment
Building site hoists
High speed hoists |